PRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

HR-30 / whole-body P0.1 / FER-G11

Measure first. Energize later.

This package turns six generic instrument placeholders into a real channel architecture for rail voltage/current, permit and contactor timing, contact temperature, thermal imaging and video correlation. It does not close FER-G11.

18

controlled channels

Eight isolated analog, four temperature, current, scope, digital, thermal and video channels.

E0-E7

bound stages

Every stage says what must be measured, checked and preserved.

0

qualified numeric trips

No fuse, current, temperature or stopping-time limit is invented.

External instrument bench

Download editable STEP. Instrument bodies are interface envelopes; received hardware controls.

Hard boundaries

No DMM rail current

The Fluke input is limited to 10 A continuously, so whole-rail current must use the 150 A clamp chain.

No direct 24 V into TTL

The NI-9401 remains disconnected until an isolated, protected 24 V-to-TTL interface is selected and verified.

No universal temperature number

Actual component ratings, probe error, ambient and attachment location must set each threshold.

Candidate instruments

Instrument IdRoleManufacturerModelOrder CodeQuantityAcquisitionVerified CapabilityCalibration StateConnection StateWarning
INS-01synchronized acquisition chassisNIcDAQ-9174781157-011BORROW/RENT PREFERRED; PURCHASE NOT RELEASED4-slot USB chassis; 12.5 ns timing resolution; 50 ppm sample-rate timing accuracy; 9-30 V input; 15 W max; 159.5 x 88.1 x 58.9 mmCHASSIS ID/SELF-TEST/SOFTWARE VERSION RECORD REQUIREDNOT CONNECTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-02isolated simultaneous voltage bank ANINI-9229 screw terminal779785-011BORROW/RENT PREFERRED; PURCHASE NOT RELEASED4 simultaneous 24-bit differential channels; nominal +/-60 V; 50 kS/s/channel; channel-to-channel isolationCURRENT CALIBRATION CERTIFICATE AND SELF-TEST REQUIREDNOT CONNECTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-03isolated simultaneous voltage bank BNINI-9229 screw terminal779785-011BORROW/RENT PREFERRED; PURCHASE NOT RELEASED4 simultaneous 24-bit differential channels; nominal +/-60 V; 50 kS/s/channel; channel-to-channel isolationCURRENT CALIBRATION CERTIFICATE AND SELF-TEST REQUIREDNOT CONNECTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-04contact-temperature acquisitionNINI-9211779001-011BORROW/RENT PREFERRED; PURCHASE NOT RELEASED4 thermocouple channels; 24-bit; 14 S/s class; cold-junction compensation; 1-year calibration intervalCURRENT CALIBRATION CERTIFICATE; ICE-POINT/REFERENCE CHECK REQUIREDNOT CONNECTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-05battery-slate digital event captureNINI-9401779351-011BORROW/RENT PREFERRED; PURCHASE NOT RELEASED8 bidirectional 5 V TTL channels; 100 ns propagation; no channel-to-channel isolationSELF-TEST AND KNOWN-PULSE CHECK REQUIREDBATTERY-ONLY SYNC SLATE CANDIDATE; DIRECT ROBOT 24 V CONNECTION PROHIBITEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-06whole-rail AC/DC current transientTektronixTCP0150TCP01501BORROW/RENT; PURCHASE NOT RELEASED25 A and 150 A ranges; 150 A RMS max; 500 A peak pulse; DC-20 MHz; 3% warranted DC accuracy; TekVPI requiredIN-DATE CALIBRATION; DEGAUSS/AUTOZERO BEFORE EACH SESSIONNOT CLAMPEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-07current/timing oscilloscopeTektronix3 Series MDO / MDO34 familyCONFIGURATION/QUOTE REQUIRED1BORROW/RENT; PURCHASE NOT RELEASEDmanufacturer lists 3 Series MDO as fully compatible with TCP0150 on analog inputsEXACT SERIAL/OPTIONS/FIRMWARE/CALIBRATION CERTIFICATE REQUIREDNOT CONNECTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-08setup/polarity/reference DMMFluke87V MAX CAL52060681PURCHASE/BORROW CANDIDATE; NOT RELEASEDtraceable calibration with data; DC voltage 0.1 mV-1000 V; +/-0.05% + 1; DC current 10 A, 20 A for 30 s onlyTRACEABLE CERTIFICATE/EXPIRY AND PRE-USE CHECK REQUIREDWHOLE-RAIL CURRENT JACK USE PROHIBITEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-09thermal survey cameraTeledyne FLIRE8 ProQUOTE/REGION SKU REQUIRED1BORROW/RENT PREFERRED; PURCHASE NOT RELEASED320 x 240 IR; 9 Hz; -20 to 550 C; +/-2 C or +/-2% under stated conditionsSERIAL/FIRMWARE/CALIBRATION STATUS; EMISSIVITY/REFLECTED-TEMP SETUP REQUIREDNON-CONTACT ONLYPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-10visual event recordSELECTION REQUIREDtripod camera with manual exposure and visible time slateSELECTION REQUIRED2EXISTING EQUIPMENT PREFERREDCORRELATION AID ONLY; NOT CALIBRATED TIMING EVIDENCECLOCK SLATE/FRAME-RATE/FILE CHECK REQUIREDNOT INSTALLEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
INS-11type-K surface probesSELECTION REQUIREDelectrically insulated surface thermocouple assemblySELECTION REQUIRED4SELECTION REQUIREDATTACHMENT, INSULATION, RANGE, LEAD AND UNCERTAINTY UNVERIFIEDBATCH/PROBE CERTIFICATE AND REFERENCE CHECK REQUIREDNOT INSTALLEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Measurement channels

Channel IdHardware ChannelSignal Or TargetMeasurement PointMeasurementRangeSample RateRequired StagesPhysical Point ReleasedCalibration Evidence PresentWarning
CH-AI-01INS-02/AI0ACT_MAIN_SOURCE_12Vsource output before interruptiondifferential voltage+/-60 V50 kS/sE0-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02INS-02/AI1ACT_MAIN_SAFE_12Vrobot inlet after dual interruptiondifferential voltage+/-60 V50 kS/sE0-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03INS-02/AI2TTL_LDIST_SAFE_9Vleft distal regulated 9 V raildifferential voltage+/-60 V50 kS/sE2-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04INS-02/AI3CTRL_5Vlogic/control raildifferential voltage+/-60 V50 kS/sE1-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05INS-03/AI0ESTOP_CH_A_24VE-stop channel A diagnostic voltagedifferential voltage+/-60 V50 kS/sE3-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06INS-03/AI1HARDWIRED_PERMIT_24VPNOZ hardwired permit statusdifferential voltage+/-60 V50 kS/sE3-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07INS-03/AI2K1_COIL_24VK1 A1-to-A2 coil voltagedifferential voltage+/-60 V50 kS/sE3-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08INS-03/AI3K2_COIL_24VK2 A1-to-A2 coil voltagedifferential voltage+/-60 V50 kS/sE3-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-TC-01INS-04/TC0T_SOURCE_CONNECTORexternal source/connector hotspottype-K temperaturePROBE SELECTION REQUIRED14 S/s classE2-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-TC-02INS-04/TC1T_CONTACTOR_PAIRdual-interruption assembly hotspottype-K temperaturePROBE SELECTION REQUIRED14 S/s classE3-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-TC-03INS-04/TC2T_SELECTED_BRANCHselected branch/protection hotspottype-K temperaturePROBE SELECTION REQUIRED14 S/s classE4-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-TC-04INS-04/TC3T_SELECTED_ACTUATORselected actuator case/connectortype-K temperaturePROBE SELECTION REQUIRED14 S/s classE5-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-I-01INS-06 + INS-07/CH1ACT_MAIN_SOURCE_CONDUCTORclamp around one source conductor onlyAC/DC current150 A range for initial whole-body railscope >=1 MS/s candidateE2-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-SCOPE-02INS-07/CH2ACT_MAIN_SAFE_12V_COPYisolated voltage-probe interface selection requiredvoltage transientPROBE SELECTION REQUIREDscope >=1 MS/s candidateE2-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-DIO-01INS-05/DIO0TIME_ZERO_BATTERY_TTLindependent battery-slate event pulse5 V TTL0-5.25 V maxhardware timedE0-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-VIDEO-01INS-10/ACELL_OVERVIEWdoors/operator/robot/cellvideo correlationN/A>=30 fps candidateE0-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-VIDEO-02INS-10/BPDU_CLOSEUPsource/interruption/instrumentsvideo correlationN/A>=30 fps candidateE0-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CH-IR-01INS-09THERMAL_OVERVIEWselected electrical/mechanical regionradiometric image-20 to 550 C9 HzE2-E7NONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

E0-E7 measurement binding

StageStage NameMandatory ChannelsMandatory PrecheckProvisional Abort BasisExecution StateTest Lead SignoffWarning
E0unpowered inspection and continuityCH-AI-01..08; CH-VIDEO-01..02all probes disconnected for resistance/continuity work; DMM current jack emptyany unexpected continuity, polarity ambiguity, damaged lead or stale calibration => STOPNOT EXECUTEDREQUIREDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
E1logic-only sourceCH-AI-04..08; CH-VIDEO-01..02actuator rail physically isolated and zero-motion boundary verifiedrail outside qualified E1 source window, unintended permit/coil state or reset-command coupling => REMOVE SOURCENOT EXECUTEDREQUIREDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
E2main source no downstream loadCH-AI-01..04; CH-I-01; CH-TC-01; CH-VIDEO-01..02; CH-IR-01current probe zeroed; source current limit set to approved dummy-load planany unexpected output current, reverse polarity, smoke/odor/arcing or voltage outside qualified window => E-STOP/REMOVE SOURCENOT EXECUTEDREQUIREDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
E3dual interruption dry exerciseCH-AI-01..08; CH-I-01; CH-TC-01..02; CH-VIDEO-01..02contact-point selection reviewed; no actuator branch connectedfailure to interrupt, mirror/coil disagreement, reset causing permit, or timing outside approved test sheet => E-STOP/REMOVE SOURCENOT EXECUTEDREQUIREDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
E4one protected branch dummy loadCH-AI-01..08; CH-I-01; CH-TC-01..03; CH-VIDEO-01..02; CH-IR-01dummy load and branch protection selected/verifiedcurrent/voltage/temperature beyond signed branch test sheet or unstable oscillation => E-STOP/REMOVE SOURCENOT EXECUTEDREQUIREDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
E5one actuator torque disabledALL EXCEPT UNUSED DIO; selected actuator telemetry additionally loggedactuator restrained; torque enable write prohibited; bus watchdog configured/read backany motion, torque-enable state, unexplained current, communication loss or temperature beyond signed sheet => E-STOP/REMOVE SOURCENOT EXECUTEDREQUIREDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
E6incremental no-motion populationALL APPLICABLE CHANNELSonly signed branch increment; mass/thermal/current budget updatedany deviation from signed population plan, unexplained current step, thermal trend or permit fault => E-STOP/REMOVE SOURCENOT EXECUTEDREQUIREDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
E7whole robot torque disabled in static cellALL 18 CHANNELSall FER gates separately closed; complete cell and restraint acceptedany motion, permit fault, guard/interlock breach, unexpected current/temperature/voltage or observer call => E-STOP/REMOVE SOURCENOT EXECUTEDREQUIREDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Abort limits and unresolved thresholds

Limit IdSignalEquipment BoundaryProvisional ObservationAutomatic TripQualified LimitActionStatusWarning
AL-01ACT_MAIN_SOURCE_12VRSP-500-12 adjustment range 10-13.2 V; exact setup 12.00 V candidateflag outside 11.70-12.30 V only as an engineering review bandNONE DEFINEDSELECTION REQUIREDmanual E-stop/source removal on unexpected excursionOPEN - NOT RELEASEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AL-02ACT_MAIN_SAFE_12Vdownstream XH/XM candidates accept 10.0-14.8 V; system source remains 12 V nominalflag outside 11.5-12.5 V only as an engineering review bandNONE DEFINEDSELECTION REQUIREDmanual E-stop/source removal; investigate drop/overshootOPEN - NOT RELEASEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AL-03TTL_LDIST_SAFE_9VPololu S18V20F9 candidate fixed 9 V; XC330 accepts 6.5-12.0 Vflag outside 8.7-9.3 V only as an engineering review bandNONE DEFINEDSELECTION REQUIREDremove source; do not connect actuator until converter/load validation closesOPEN - NOT RELEASEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AL-04CTRL_5Vexact final compute/control converter and loads unresolvedNONE - equipment-specific window missingNONE DEFINEDSELECTION REQUIREDremove logic source on unexpected behavior or qualified-sheet excursionOPEN - NOT RELEASEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AL-05ACT_MAIN_SOURCE_CURRENTRSP-500-12 rated output 41.7 A; project provisional peak demand 60.58 A exceeds sourceNO NUMERIC ABORT CURRENT RELEASEDSOURCE CURRENT LIMIT IS NOT A VALIDATED BRANCH PROTECTION FUNCTIONREQUIRES DUMMY-LOAD/BRANCH DATA, FAULT CURRENT, PROTECTION COORDINATION AND DUTY CYCLEtest lead uses signed stage sheet; unexplained current at any level is STOPOPEN - NOT RELEASEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AL-06CONTACT TEMPERATUREScomponent/connector/probe-specific allowable temperatures unresolvedtrend and hotspot observation only; no universal Celsius limit inventedNONE DEFINEDREQUIRES RECEIVED COMPONENT RATINGS, AMBIENT, PROBE ERROR, LOCATION AND QUALIFIED LIMITsmoke, odor, discoloration, rapid unexplained rise or observer concern => STOPOPEN - NOT RELEASEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AL-07PERMIT/CONTACTOR TIMINGtotal stopping/interruption-time requirement not yet allocated or physically measuredrecord edge order and raw latency; no pass thresholdNONE DEFINEDREQUIRES SAFETY REQUIREMENTS SPECIFICATION AND QUALIFIED VALIDATIONwrong sequence, reset-created permit, missing interruption or channel disagreement => STOPOPEN - NOT RELEASEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AL-08ANY VISIBLE MOTION E0-E7all stages are no-motion; E7 torque disabledzero intentional motionlocal deterministic torque-disable/E-stop path must be separately validatedANY OBSERVED MOTION IS ABORT FOR THIS PACKAGEE-stop then source removal; do not reset until cause reviewedPROCEDURAL ABORT - NOT SAFETY VALIDATIONPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AL-09OPERATOR/OBSERVER CALLhuman stop call has no numeric thresholdany person may call STOPNONEIMMEDIATE ABORTE-stop/source removal and preserve dataPROCEDURAL ABORTPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Probe connection plan

Connection IdChannelPhysical BoundaryMethodConnector Pinout ReleasedProbe Protection ReleasedInstalledWarning
PC-01CH-AI-01source output diagnostic terminalsfused differential leads; exact test-point connector and inline protection selection requiredNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-02CH-AI-02robot inlet after K1/K2fused differential leads; test point must not bypass interruptionNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-03CH-AI-03one selected regulated 9 V busbreakout/test point selection required; other 9 V buses remain disconnectedNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-04CH-AI-045 V logic test pointconverter/source identity selection requiredNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-05CH-AI-05E-stop A diagnostic nodehigh-impedance measurement only; exact terminal and protection requiredNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-06CH-AI-06watchdog permit diagnostic nodemeasurement must not source/hold permitNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-07CH-AI-07K1 coil or mirror diagnostic nodeexact measured state and terminal selection requiredNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-08CH-AI-08K2 coil or mirror diagnostic nodeexact measured state and terminal selection requiredNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-09CH-I-01single ACT_MAIN_SOURCE conductorsplit core fully latched; arrow/polarity photographed; no two-conductor clampNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-10CH-TC-01..04four named surfaceselectrically insulated attachment and strain relief selection requiredNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-11CH-DIO-01isolated time-zero interfacedirect 24 V connection to NI-9401 prohibitedNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
PC-12CH-SCOPE-02isolated voltage probe interfaceprobe/order code and common-mode rating selection requiredNONONOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Calibration and pre-use checks

Check IdItemRequired EvidenceFrequencyStateAcceptance AuthorityWarning
CAL-01cDAQ chassis/modulesserials, DAQmx version, self-test, calibration certificates and expirybefore first use and every session identity checkNOT EXECUTEDTEST LEAD + QUALIFIED REVIEW WHERE APPLICABLEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CAL-02NI-9229 voltage channelszero and known traceable low-voltage source check; polarity; channel mapbefore each sessionNOT EXECUTEDTEST LEAD + QUALIFIED REVIEW WHERE APPLICABLEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CAL-03NI-9211 + four probesprobe identity, open-probe detection, room/reference comparison, attachment photobefore each session and after relocationNOT EXECUTEDTEST LEAD + QUALIFIED REVIEW WHERE APPLICABLEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CAL-04TCP0150 + scopeserials/certificates, 150 A range, degauss, autozero, closed-jaw zero capturebefore each stage that measures currentNOT EXECUTEDTEST LEAD + QUALIFIED REVIEW WHERE APPLICABLEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CAL-05Fluke 87V MAX CALtraceable certificate with data, lead/fuse inspection, current jack emptybefore each sessionNOT EXECUTEDTEST LEAD + QUALIFIED REVIEW WHERE APPLICABLEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CAL-06FLIR E8 Proserial/firmware/calibration status, emissivity/reflected temperature/distance and visual referencebefore each thermal surveyNOT EXECUTEDTEST LEAD + QUALIFIED REVIEW WHERE APPLICABLEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CAL-07time correlationsingle visible/electrical slate pulse recorded by DAQ/scope/video; offset table retainedbefore each sessionNOT EXECUTEDTEST LEAD + QUALIFIED REVIEW WHERE APPLICABLEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
CAL-08abort rehearsalunpowered verbal call, E-stop reach, source disconnect, fire response and data preservationbefore each powered sessionNOT EXECUTEDTEST LEAD + QUALIFIED REVIEW WHERE APPLICABLEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Triggers and time correlation

Record IdSystemTimebaseTriggerPretriggerPosttriggerReleasedWarning
TR-01cDAQ analogcDAQ-9174 chassis; NI-9229 simultaneous channels; module timing per NI specificationssoftware pre-arm then isolated event edge/analog threshold candidate>=1 s candidate>=5 s candidateNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
TR-02Tektronix scopescope internal; exact MDO34 option/firmware/calibration requiredTCP0150 current edge or isolated rail-voltage edge>=20% record candidatestage dependentNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
TR-03cross-system correlationnot inherently common between cDAQ, scope, video and FLIRone isolated electrical slate plus visible LED slate; interface selection requiredall recorders rolling before slateretain second slate after testNO - measured offsets/uncertainty requiredPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
TR-04video/FLIRcamera clocks are correlation aids onlycontinuous recording with visible slate>=10 s candidate>=10 s candidateNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Dry rehearsal traveler

StepActionRequired RecordAbort On FailureStateWarning
1verify signed stage sheet, FER gates applicable to stage, site and rolessigned authorization packetYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
2record repository SHA and freeze channel/limit register hashesrun metadataYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
3inspect leads, fuses, clamps, probe insulation, strain relief and routinginspection photos/checklistYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
4record serials, calibration expiry, firmware/software and self-testscalibration registerYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
5connect only with all sources locked out and prove absence of voltageLOTO/absence-of-voltage recordYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
6continuity/polarity/channel injection check without robot powerchannel verification fileYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
7rehearse STOP call, E-stop, source removal, fire response and data preservationrehearsal witness recordYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
8arm DAQ/scope/video/thermal systems and perform correlation slatetime-offset recordYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
9execute only the signed stage while two-person control is maintainedraw synchronized evidenceYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
10abort or complete; remove source; prove absence of voltage before touching probesshutdown recordYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
11hash raw evidence immediately and write immutable run manifestdata manifestYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
12review anomalies; no next-stage progression without signed dispositionreview dispositionYESNOT EXECUTEDPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Open holds

Hold IdItemClosure EvidenceStateAuthorityWarning
H-01instrument availability and exact serial/configurationborrow/rental confirmations, exact scope options and all received serialsOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-02calibration statusin-date certificates and pre-use checks for every measurement chainOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-03physical test points and protected probesreleased terminal/pin map, fused leads, connectors and strain reliefOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-04current and branch abort limitsdummy-load data, fault current, branch protection coordination, inrush and duty cycleOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-05temperature abort limitsreceived component/connector ratings, probe location/error, ambient and qualified thresholdsOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-06interruption/stopping timing limitssafety requirements specification, allocated response limits and validated timing modelOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-07digital isolation interface24 V-to-TTL interface selection, schematic, fault analysis and validationOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-08scope voltage probeisolated/differential probe exact order code, range, common-mode and calibrationOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-09thermocouple probe systemprobe type/order code, electrical insulation, attachment, uncertainty and routingOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-10time correlation uncertaintyimplemented slate interface and measured DAQ/scope/video/thermal offsetsOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-11data acquisition softwarefrozen DAQmx/FlexLogger or equivalent version, configuration, raw format and alarm behaviorOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
H-12qualified test procedure and signofftest-lead, electrical and functional-safety review of limits/procedureOPEN - SELECTION/EXECUTION REQUIREDNONEPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Candidate acquisition list

Item IdItemCandidate Order CodeQuantityAcquisitionProcurement ReleasedWarning
B-01NI cDAQ-9174 chassis781157-011BORROW/RENT PREFERREDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-02NI-9229 screw-terminal module779785-012BORROW/RENT PREFERREDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-03NI-9211 thermocouple module779001-011BORROW/RENT PREFERREDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-04NI-9401 TTL DIO module779351-011BORROW/RENT; HOLD DISCONNECTEDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-05TCP0150 current probeTCP01501BORROW/RENTNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-06compatible 3 Series MDO oscilloscopeMDO34 CONFIGURATION REQUIRED1BORROW/RENTNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-07Fluke 87V MAX CAL52060681PURCHASE/BORROW CANDIDATENOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-08FLIR E8 ProREGION SKU/QUOTE REQUIRED1BORROW/RENTNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-09insulated type-K surface probesSELECTION REQUIRED4SELECTION REQUIREDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-10protected differential lead setsSELECTION REQUIRED8SELECTION REQUIREDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-11isolated 24 V-to-TTL event interfaceSELECTION REQUIRED1SELECTION REQUIREDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-12isolated scope voltage probeSELECTION REQUIRED1SELECTION REQUIREDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-13tripod video camerasSELECTION REQUIRED2EXISTING EQUIPMENT PREFERREDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
B-14900 x 600 instrument bench/guard fixturePROJECT CAD CANDIDATE1DFM/ASSEMBLY SELECTION REQUIREDNOPRELIMINARY - UNBUILT FIRST-ENERGIZATION INSTRUMENTATION CANDIDATE - ABORT LIMITS ARE NOT QUALIFIED OR RELEASED - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

A physical panel now replaces generic voltage clips

8 x 2

mutually floating, current-limited analog conductors.

Battery sync slate

The visible LED and TTL event have no robot electrical connection.

Still unbuilt

Harnesses, calibration and qualified limits remain open; FER-G11 is not closed.

Open the measurement-boundary panel guide.