HR-30 / pelvis / physical auxiliary power

The imaginary converter is gone.

Two current 30 W modules and one current 40 W HMI module separate compute, face/HMI and deterministic-control loads on one dimensioned carrier.

3

isolated rails

No positive outputs are paralleled.

100 W

published total

Against a 72 W coarse short-peak budget.

150 x 58

millimetres

Editable carrier envelope with four M3 mounting holes.

10 W

HMI headroom

Positive coarse margin; physical load and thermal validation remain mandatory.

Power path

Editable module layout

Rail allocation

Rail IdConverterInput VdcOutput VdcPublished Capacity WP0 1 Peak Budget WCapacity Margin WLoadsSecondary ReturnStateWarning
AUX-COMPUTEREC30E-2405SZ9-365.0 nominal; 5.1 target validation required30273Raspberry Pi 5 and compute-only accessoriesAUX_0V_STARCANDIDATE - LOAD/TRANSIENT/THERMAL VALIDATION OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-HMITEN 40-1211E9-185.0 nominal403010display, cameras, microphones, audio and networkAUX_0V_STARCANDIDATE - POSITIVE COARSE HEADROOM; LOAD/TRANSIENT/THERMAL VALIDATION OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-CONTROLREC30E-2405SZ9-365.0 nominal301515motion controller, two interface carriers, pelvis IMU and foot sensingAUX_0V_STARCANDIDATE - LOAD/TRANSIENT/THERMAL VALIDATION OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Connector contacts

ConnectorRailContactNetPhysical FamilyMapping StateWarning
JI1COMPUTE1COMPUTE_12V_RAWB3P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JI1COMPUTE2ACT_0V_CONTROLLEDB3P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JI1COMPUTE3COMPUTE_DISABLE_NB3P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JO1COMPUTE1COMPUTE_5V1B2P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JO1COMPUTE2AUX_0V_STARB2P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JI2HMI1HMI_12V_RAWB3P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JI2HMI2ACT_0V_CONTROLLEDB3P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JI2HMI3HMI_DISABLE_NB3P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JO2HMI1HMI_5V0B2P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JO2HMI2AUX_0V_STARB2P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JI3CONTROL1CONTROL_12V_RAWB3P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JI3CONTROL2ACT_0V_CONTROLLEDB3P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JI3CONTROL3CONTROL_DISABLE_NB3P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JO3CONTROL1AUX_5V_SAFEB2P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
JO3CONTROL2AUX_0V_STARB2P-VH-BPROJECT-OWNED CANDIDATE - HARNESS/DERATING/KEYING OPENPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Open gates

Hold IdOpen ItemClosure EvidenceStateAuthorityWarning
AUX-H01input fuse values and holdersavailable fault current, inrush, cable length/gauge, connector limits, ambient/bundling and clearing coordinationOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-H02reverse-polarity and inrush front endsexact circuits/order codes, SOA, fault cases, startup and physical validationOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-H03HMI rail 10 W coarse headroom is not physical validationmeasured worst-case device/startup loads, accepted derating and transient/thermal proof within the 40 W module envelopeOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-H04compute 5.1 V target and all trim networkscable-drop/load-step measurements and exact trim components; no remote voltage trim driveOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-H05secondary return star and sole PE bondsigned grounding disposition, exact bond hardware/location, fault and EMC evidenceOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-H06JST VH mating parts, contacts, wire and deratingexact order codes, contact crimp qualification, current/temperature rise and retentionOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-H07PCB footprint, copper, thermal and EMCindependent layout review, received-part FAI, current-density/temperature, RECOM/TRACO filter disposition and compliance testsOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-H08pelvis fit, airflow, guard and service accessintegrated CAD interference review, thermal test, DFM/FAI and safe touch/access assessmentOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-H09unpowered assembly inspection and testsigned traveler, continuity/isolation/polarity records and calibrated instrumentsOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-H10qualified electrical review and work authorityseparate signed review and staged work authorization; this package cannot grant energizationOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Inspection and test

Test IdTestAcceptance Or EvidenceResultReviewAuthorityWarning
AUX-T01received identity and pin FAItwo REC30E-2405SZ plus one TEN 40-1211E order codes, lot markings, body/pin coordinates and isolation spacing match controlled drawingsNOT EXECUTEDREQUIREDNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-T02unpowered continuity and isolationall contact-to-pad paths match map; no rail-positive cross connection; qualified isolation voltage still requiredNOT EXECUTEDREQUIREDNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-T03polarity and disable behavioreach CTRL input independently disables only its rail; open=ON behavior documented; no safety creditNOT EXECUTEDREQUIREDNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-T04current-limited startupinput/output waveforms, inrush, delay, overshoot and source-current limit recorded for each unloaded railNOT EXECUTEDREQUIREDNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-T05load step and cable drop0-100%/75-100% rail tests at min/nom/max input and final harness; voltage stays within accepted load limitsNOT EXECUTEDREQUIREDNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-T06thermal soakcase, connector, protection and PCB temperatures at accepted worst load/ambient/airflowNOT EXECUTEDREQUIREDNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-T07single-fault behaviorfuse/protection/short/reverse/dropout cases performed under released low-energy procedureNOT EXECUTEDREQUIREDNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION
AUX-T08grounding and EMCstar/bond continuity, common-mode current and conducted/radiated disposition acceptedNOT EXECUTEDREQUIREDNO PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT AUXILIARY-POWER MODULE CANDIDATE - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION, POWERED TESTING, MOTION, WALKING OR ENERGIZATION

Engineering files

native KiCad project · native PCB · front copper view · schematic export · STEP assembly · component register · manufacturer sources