PRELIMINARY - IMPLEMENTATION MAP ONLY - NOT FUNCTIONALLY SAFETY VALIDATED - NOT APPROVED FOR CONNECTION, POWERED TESTING, MOTION OR ENERGIZATION

What is implemented, exactly?

Every SRS function is mapped to current physical terminals or marked absent. ERC cleanliness is not treated as functional-safety validation.

IDSafety functionCurrent implementationRequired closure
SFR-01Emergency-stop demand removes actuator energyECAD CONNECTED - UNVALIDATEDDC application, timing, diagnostic coverage, fault exclusions, CCF and physical tests
SFR-02Prevention of unexpected restartECAD CONNECTED / FIRMWARE BOUNDARY DEFINED - UNVALIDATEDfalling-edge behavior, power-cycle/brownout/HIL and physical zero-motion proof
SFR-03External-device monitoringECAD CONNECTED - UNVALIDATEDdiagnostic coverage, timing, fault injection, CCF and qualified validation
SFR-04Control-power loss enters safe statePARTIAL ARCHITECTUREas-built supply decay, firmware/HIL, contactor opening, actuator torque decay and collapse containment
SFR-05Actuator VDD backfeed preventionNOT IMPLEMENTED - HARNESS BLOCKERcustom/de-pinned data-only links, 283-terminal physical bindings, 25 branch feeds and as-built tests
SFR-06Branch overcurrent interruptionNOT IMPLEMENTEDfault current, wire length, ambient, bundling, inrush, duty, connector limits, regeneration and jurisdiction
SFR-07Watchdog loss requests safe stopDEFINED - NO SAFETY CREDIThardware implementation, fault response and any future safety allocation
SFR-08Torque-disable commandCOMPILED - UNFLASHED - STANDARD CONTROLflash, bench test, all 25 axes, bus loss, timeout and torque-decay evidence
SFR-09Charger interlockFUTURE - NOT IMPLEMENTEDonboard source/charger architecture and fault-tested hardwired interlock
SFR-10Fall restraint prevents head/floor contactNOT SELECTED OR PROVEDWLL, arrest energy, travel, attachment loads, inspection and qualified mechanical acceptance
SFR-11Safety-related speed/travel limitingNOT IMPLEMENTED - MOTION PROHIBITEDarchitecture, PLr allocation, independent sensing, response time and validation
SFR-12Power-loss collapse containmentNOT IMPLEMENTED - MOTION PROHIBITEDaccepted restraint, joint decay, gravity motion, braking, rebound, overtravel and physical proof

Exact current circuit

Open the terminal/net map / download the full implementation matrix / open holds.

Current conclusion

Only SFR-01 through SFR-03 have a connected candidate circuit, and it remains unvalidated. SFR-04 is partial. SFR-05 and SFR-06 expose unresolved harness/protection blockers. SFR-07 and SFR-08 are standard-control paths with no safety credit. SFR-09 through SFR-12 are not implemented.