PRELIMINARY - PROTECTION AND CONDUCTOR ARCHITECTURE ONLY - NOT APPROVED FOR PROCUREMENT, CONNECTION, POWERED TESTING, MOTION OR ENERGIZATION

HR-30 whole-body P0.1

The power hierarchy is coherent. Its ratings are not released.

The controller-only path is physically separated from actuator power. The whole-body path now binds one source, dual interruption, eight protected feeds, eight one-bus boards and 25 individual actuator branches.

41.7 A

candidate source continuous endpoint

46.678 A

arithmetic sum of candidate axis caps

71.88 A

published stall-endpoint sum; not normal demand

0

released fuse values or hot conductor ratings

Two intentionally separate power paths

Eight electrically separate whole-robot feeds

These current figures are arithmetic boundaries. They are not fuse, wire, connector or supply ratings.

FeedBusesCap sum AStall endpoint AFuse
FB1RS-LLEG13.99338024.200SELECTION REQUIRED
FB2RS-RLEG13.99338024.200SELECTION REQUIRED
FB3RS-LARM5.9960106.900SELECTION REQUIRED
FB4RS-RARM5.9960106.900SELECTION REQUIRED
FB5RS-WAIST2.4990104.400SELECTION REQUIRED
FB6TTL-LDIST1.4000001.760SELECTION REQUIRED
FB7TTL-RDIST1.4000001.760SELECTION REQUIRED
FB8TTL-HEAD1.4000001.760SELECTION REQUIRED

Open the complete eight-feed register · eight-bus register · 25-axis conductor screen

Staged separation rules

FER-E0

MECHANICAL INSPECTION

all sources physically absent

OPEN · NO MOTION
FER-E1

UNPOWERED ELECTRICAL INSPECTION

all sources and stored energy absent; discharge verified

OPEN · NO MOTION
FER-E2

LOGIC-ONLY CONTROLLER

all actuator carriers, buses and actuator connectors physically absent

OPEN · NO MOTION
FER-E3

SAFETY-LOGIC TEST

contactor load side and actuator buses physically absent

OPEN · NO MOTION
FER-E4

ONE-AXIS BENCH

never connected to whole-body power; torque disabled

OPEN · NO MOTION
FER-E5

ONE-BUS-BOARD BRANCH LOAD TEST

no actuators attached; all other feeds absent

OPEN · NO MOTION
FER-E6

WHOLE DISTRIBUTION NO LOAD

source current limited below separately approved inspection limit

OPEN · NO MOTION
FER-E7

RESTRAINED WHOLE-ROBOT RAIL TEST

all prior gates complete; torque disabled; zero motion request

OPEN · NO MOTION

What must be measured before selecting protection

Fourteen missing-input records cover prospective fault current, measured load, ambient, bundling, inrush, regeneration, connector limits and jurisdiction.

Open holds

Machine-readable status · primary manufacturer sources · seven protection layers