PRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION

HR-30 / FER-G11 / pre-connection metrology

Calibrate the entire voltage-measurement chain without touching the robot.

A passive three-port fixture drives one floating pod, cable, panel lane and NI input at a time while an independent calibrated meter records the real source voltage.

1

lane at a time

No channel returns are joined. Seven source inputs remain disconnected during every run.

72 x 3

scheduled samples

Nine points on eight lanes, each repeated three times, preserve zero-return and hysteresis evidence.

0-24 V

source envelope

The exact candidate source covers the whole planned signal range. A 10 mA setting is provisional until reviewed and verified.

0

robot connections

This fixture is for disconnected chains only. Source taps, numeric limits, build and qualified review remain open.

Physical test architecture

Native routed PCB

Top render of the passive three-port calibration fixture PCB

Fixture packaging candidate

What becomes measurable

Per-channel gain, offset, residuals, polarity, open-lead signature, noise, crosstalk and repeatability across the assembled pod-to-NI chain.

What remains outside this fixture

Robot source-terminal loading, safety-circuit behavior, the short upstream source tails, real switching transients and all motion or stop-time measurements.

No paper pass

The fixture and every cable are unbuilt. The schedule defines evidence; it does not manufacture calibration results.

Eight sequential channel builds

SequenceChannel IdSignalPlanning Full Scale V Not LimitPodPod InputPod OutputPanel InputPanel OutputNi ModuleNi ChannelSimultaneous Fixture ChannelsRobot Disconnected RequiredStateWarning
1CH-AI-01ACT_MAIN_SOURCE_12V12.0DP-01JIN.1/JIN.2JOUT.1/JOUT.2J1I.1/J1I.2J1O.1/J1O.2NI-9229-AAI01YESNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
2CH-AI-02ACT_MAIN_SAFE_12V12.0DP-02JIN.1/JIN.2JOUT.1/JOUT.2J2I.1/J2I.2J2O.1/J2O.2NI-9229-AAI11YESNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
3CH-AI-03TTL_LDIST_SAFE_9V9.0DP-03JIN.1/JIN.2JOUT.1/JOUT.2J3I.1/J3I.2J3O.1/J3O.2NI-9229-AAI21YESNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
4CH-AI-04CTRL_5V5.0DP-04JIN.1/JIN.2JOUT.1/JOUT.2J4I.1/J4I.2J4O.1/J4O.2NI-9229-AAI31YESNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
5CH-AI-05ESTOP_CH_A_24V24.0DP-05JIN.1/JIN.2JOUT.1/JOUT.2J5I.1/J5I.2J5O.1/J5O.2NI-9229-BAI01YESNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
6CH-AI-06HARDWIRED_PERMIT_24V24.0DP-06JIN.1/JIN.2JOUT.1/JOUT.2J6I.1/J6I.2J6O.1/J6O.2NI-9229-BAI11YESNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
7CH-AI-07K1_COIL_24V24.0DP-07JIN.1/JIN.2JOUT.1/JOUT.2J7I.1/J7I.2J7O.1/J7O.2NI-9229-BAI21YESNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
8CH-AI-08K2_COIL_24V24.0DP-08JIN.1/JIN.2JOUT.1/JOUT.2J8I.1/J8I.2J8O.1/J8O.2NI-9229-BAI31YESNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION

Calibration point schedule

Channel IdSignalPoint OrdinalRequested Source VWithin Channel Planning RangeRepeat CountSource Current Limit Candidate MaReference ValueNi Raw ValueFit UsePerformance Acceptance LimitStateWarning
CH-AI-01ACT_MAIN_SOURCE_12V10.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-01ACT_MAIN_SOURCE_12V21.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-01ACT_MAIN_SOURCE_12V32.500YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-01ACT_MAIN_SOURCE_12V45.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-01ACT_MAIN_SOURCE_12V59.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-01ACT_MAIN_SOURCE_12V612.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-01ACT_MAIN_SOURCE_12V718.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-01ACT_MAIN_SOURCE_12V824.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-01ACT_MAIN_SOURCE_12V90.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02ACT_MAIN_SAFE_12V10.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02ACT_MAIN_SAFE_12V21.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02ACT_MAIN_SAFE_12V32.500YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02ACT_MAIN_SAFE_12V45.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02ACT_MAIN_SAFE_12V59.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02ACT_MAIN_SAFE_12V612.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02ACT_MAIN_SAFE_12V718.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02ACT_MAIN_SAFE_12V824.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-02ACT_MAIN_SAFE_12V90.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03TTL_LDIST_SAFE_9V10.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03TTL_LDIST_SAFE_9V21.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03TTL_LDIST_SAFE_9V32.500YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03TTL_LDIST_SAFE_9V45.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03TTL_LDIST_SAFE_9V59.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03TTL_LDIST_SAFE_9V612.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03TTL_LDIST_SAFE_9V718.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03TTL_LDIST_SAFE_9V824.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-03TTL_LDIST_SAFE_9V90.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04CTRL_5V10.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04CTRL_5V21.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04CTRL_5V32.500YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04CTRL_5V45.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04CTRL_5V59.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04CTRL_5V612.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04CTRL_5V718.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04CTRL_5V824.000EXTENDED BENCH CHARACTERIZATION ONLY310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-04CTRL_5V90.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05ESTOP_CH_A_24V10.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05ESTOP_CH_A_24V21.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05ESTOP_CH_A_24V32.500YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05ESTOP_CH_A_24V45.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05ESTOP_CH_A_24V59.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05ESTOP_CH_A_24V612.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05ESTOP_CH_A_24V718.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05ESTOP_CH_A_24V824.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-05ESTOP_CH_A_24V90.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06HARDWIRED_PERMIT_24V10.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06HARDWIRED_PERMIT_24V21.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06HARDWIRED_PERMIT_24V32.500YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06HARDWIRED_PERMIT_24V45.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06HARDWIRED_PERMIT_24V59.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06HARDWIRED_PERMIT_24V612.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06HARDWIRED_PERMIT_24V718.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06HARDWIRED_PERMIT_24V824.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-06HARDWIRED_PERMIT_24V90.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07K1_COIL_24V10.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07K1_COIL_24V21.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07K1_COIL_24V32.500YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07K1_COIL_24V45.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07K1_COIL_24V59.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07K1_COIL_24V612.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07K1_COIL_24V718.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07K1_COIL_24V824.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-07K1_COIL_24V90.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08K2_COIL_24V10.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08K2_COIL_24V21.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08K2_COIL_24V32.500YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08K2_COIL_24V45.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08K2_COIL_24V59.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08K2_COIL_24V612.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08K2_COIL_24V718.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08K2_COIL_24V824.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDYESQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CH-AI-08K2_COIL_24V90.000YES310MEASURE WITH IN-DATE FLUKE 87V MAX CALNOT EXECUTEDZERO/HYSTERESIS CHECKQUALIFIED SELECTION REQUIREDNOT EXECUTEDPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION

Controlled off-robot procedure

Step IdActionMethodStop Or BoundaryExecution StateAuthorityWarning
CF-P01prove robot separationPhotograph all eight pod JIN source tails disconnected from robot and cap them; continuity proves no fixture-to-robot path.STOP if any robot, safety, actuator, PE or chassis connection existsNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P02record equipment identityRecord source, DMM, cDAQ, both NI-9229 serials, firmware/software, calibration certificates and expiry.STOP for expired/missing calibration or failed self-testNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P03inspect passive fixtureContinuity CAL_HI JPS-JHI-JDUT and CAL_LO JPS-JLO-JDUT; >10 Mohm between HI/LO and enclosure/PE with all external leads removed.STOP on map, insulation or damage discrepancyNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P04set isolated sourceOutput OFF; select one E36313A output 2 or 3; candidate 10 mA current limit; verify no earth-reference strap or series/parallel coupling.Qualified setup approval remains requiredNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P05connect reference meterConnect red/black TL930 leads from JHI/JLO to the Fluke V/ohm and COM inputs; verify both current jacks empty and polarity correct.STOP if either meter current input is usedNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P06connect one chainConnect JDUT only to selected pod JIN; connect that pod through its 3 m cable, panel lane and measurement harness to one NI-9229 channel.All seven other lanes remain disconnected from fixtureNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P07zero checkCommand 0 V, turn output ON, record DMM and NI samples; then output OFF.No numerical acceptance until qualified limits are releasedNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P08ascending pointsFor each scheduled nonzero point: output OFF, set value, verify 10 mA limit, output ON, settle, record DMM and NI; output OFF before change.Never exceed 24.0 V candidate ceilingNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P09descending zeroReturn to 0 V and record end zero for offset/hysteresis evidence.Retain raw time series, not summaries onlyNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P10polarity characterizationWith output OFF, use a separately labeled crossed JDUT cable; apply 1 V then the channel planning voltage and record negative response.Characterization only; fault-detection limit openNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P11open-lead characterizationWith output OFF, use separately labeled HI-open and LO-open cables; apply 1 V and planning voltage; characterize the actual invalid/open signature.Do not assume an open input reads zeroNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P12isolation/noiseAt 0 V and planning voltage capture at least 10 s raw data while all other fixture inputs remain disconnected.Noise/crosstalk limits openNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P13repeatPerform three complete repeats per point and retain environmental temperature and elapsed time.Missing repeat leaves channel uncalibratedNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P14fit and uncertaintyFit source voltage = gain * NI voltage + offset per channel; retain residuals and uncertainty contributors.Nominal 1.4204 factor is comparison onlyNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-P15close outOutput OFF, disconnect source, cap all leads, archive raw data and signed traveler.This does not authorize robot connection or energizationNOT EXECUTEDNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION

Safe bench fault characterization

Fault IdConditionControlled Adapter Or ActionRequired ObservationRobot ConnectionExecution StateSafety CreditWarning
CF-F01normal polaritystandard straight-through JDUT cablepositive slope and recorded residuals; numeric limit openPROHIBITEDNOT EXECUTEDNONEPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-F02reversed polaritydedicated red-tagged crossed JDUT cablenegative response must be recognizable; threshold openPROHIBITEDNOT EXECUTEDNONEPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-F03HI lead opendedicated orange-tagged one-conductor cablecharacterize actual invalid/open signature; do not infer zeroPROHIBITEDNOT EXECUTEDNONEPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-F04LO lead opendedicated orange-tagged one-conductor cablecharacterize actual invalid/open signature; do not infer zeroPROHIBITEDNOT EXECUTEDNONEPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-F05JDUT HI-LO shortdedicated black shorting plug; source output OFF during installationE36313A enters current limiting at candidate 10 mA; qualified test approval openPROHIBITEDNOT EXECUTEDNONEPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-F06wrong panel laneconnect selected pod output to a nonmatching panel lane during unpowered continuity onlychannel map discrepancy must be found before voltage applicationPROHIBITEDNOT EXECUTEDNONEPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-F07adjacent NI lane observationone driven lane; seven source inputs disconnectedrecord crosstalk/noise; acceptance limit openPROHIBITEDNOT EXECUTEDNONEPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-F08source removed mid-recordturn E36313A output OFF without changing wiringcapture decay/open behavior; detection-time limit openPROHIBITEDNOT EXECUTEDNONEPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION

Candidate BOM

ItemManufacturerOrder CodeQuantityBasisStateProcurement ReleasedWarning
passive calibration breakout PCBSELECTION REQUIREDSELECTION REQUIRED1104 x 76 x 1.6 mm two-layer native KiCad designFABRICATOR/STACKUP/FINISH/DFM OPENNOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
2-position 5.08 mm horizontal PCB headerPhoenix Contact17572422JPS and JDUTEXACT CANDIDATENOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
2-position 5.08 mm screw plugPhoenix Contact17570197source pair, normal, reverse, HI-open, LO-open and controlled short adapterEXACT CONNECTOR; CABLE TERMINATIONS DEFINED IN SEPARATE CABLE-KIT PACKAGENOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
right-angle PCB 4 mm safety jack, redPomona Electronics73099-21JHI direct DMM monitorEXACT CANDIDATE; MANUFACTURER DRAWING D2134437 REV.101; RECEIVED FAI OPENNOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
right-angle PCB 4 mm safety jack, blackPomona Electronics73099-01JLO direct DMM monitorEXACT CANDIDATE; MANUFACTURER DRAWING D2134437 REV.101; RECEIVED FAI OPENNOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
61 cm red/black 4 mm patch-cord pairFlukeTL930 / part 16166711fixture JHI/JLO to 87V MAX V/ohm and COM inputsEXACT CANDIDATE; 30 V RMS/60 V DC, 8 A; RECEIPT/LEAD INSPECTION OPENNOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
flanged-lid ABS enclosure 121 x 94 x 34 mmHammond Manufacturing1591GFLBK1fixture housing candidateEXACT ENVELOPE CANDIDATE; PCB SUPPORT/CUTOUT/FAI OPENNOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
triple-output programmable DC supplyKeysightE36313A1output 2 or 3; 0-25 V / 0-2 A; low-current range availableBORROW CANDIDATE; RECEIPT/CALIBRATION/ISOLATION CHECK OPENNOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
traceably calibrated DMMFluke5206068 (87V MAX CAL)1independent source-voltage referenceEXACT CANDIDATE; CERTIFICATE/DUE DATE/LEAD INSPECTION OPENNOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
source and fault-injection cable setPROJECT ASSEMBLYHR30-MCF-CK-P0.11normal, reverse, HI-open, LO-open, short and source leads; keyed labels requiredDEFINED IN SEPARATE CABLE-KIT PACKAGE; UNBUILTNOPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION

Open before any execution or robot connection

Hold IdItemClosure EvidenceStateAuthorityWarning
CF-H01fixture PCB/enclosure DFM and FAIfabricator stackup/finish, Hammond internal fit, supports, connector cutouts, labels and strain reliefOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-H02exact cable constructionwire, plugs, terminations, polarity, labels, continuity, retention and short/open adapter controlsOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-H03received calibrated instrumentsserials, firmware, self-test, certificates, due dates and exact configurationOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-H04qualified calibration procedure and limitsapproved point set/current limit/settling/sample duration/fit/residual/noise/crosstalk/uncertainty criteriaOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-H05fixture build and inspectionall passive continuity, insulation, enclosure, connector and labeling tests executedOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-H06eight complete-chain calibration executionsthree repeats per point plus polarity/open/noise characterization and immutable raw dataOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-H07independent metrology/electrical reviewaccepted uncertainty budget, fit method, traceability and channel dispositionsOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-H08robot-side source-tap packageseparate device-specific terminal hardware, loading/fault review and installed source-tail evidenceOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION
CF-H09FER-G11 closuresigned whole-session instruments, numeric abort limits, dry rehearsal and qualified stage authorizationOPENNO PROCUREMENT, FABRICATION, ASSEMBLY, ROBOT CONNECTION, POWERED-ROBOT-TEST, MOTION, WALKING OR ENERGIZATION AUTHORITYPRELIMINARY - UNBUILT OFF-ROBOT MEASUREMENT CALIBRATION FIXTURE - ZERO SAFETY CREDIT - NOT APPROVED FOR PROCUREMENT, FABRICATION, ASSEMBLY, CONNECTION TO THE ROBOT, POWERED ROBOT TESTING, MOTION, WALKING OR ENERGIZATION

Engineering files

KiCad project · routed PCB · STEP · point schedule · data schema · manufacturer sources