PRELIMINARY - UNBUILT LOGIC-ONLY POWER FIXTURE - NOT APPROVED FOR CONNECTION, POWERED TESTING, MOTION OR ENERGIZATION

HR-30 whole-body P0.1

A real cable and supply candidate—still no permission to plug it in.

The controller power boundary now has exact purchasable parts and an inspection path. Limits, grounding and every physical result remain open.

9

candidate line items

2

fully mapped conductors

9

release gates

0

built cables or powered tests

Connection boundary

Build and release records

Nine gates before connection

LP-G01

Received supply identity

SPD3303X model/serial/firmware and intact mains lead recorded

NOT EXECUTED
LP-G02

Calibration and self-test

in-date calibration basis and startup self-test recorded

NOT EXECUTED
LP-G03

Received controller identity

board revision/serial/J1 orientation and input-population inspection recorded

NOT EXECUTED
LP-G04

Setpoint release

qualified reviewer freezes voltage tolerance, current limit and OCP from received-board evidence

NOT EXECUTED
LP-G05

Reference release

floating-output assumption, PE/DC-reference disposition and all grounded instruments reviewed

NOT EXECUTED
LP-G06

Cable assembly acceptance

crimp height/pull, polarity, continuity, shorts, length, labels and strain relief pass

NOT EXECUTED
LP-G07

No-actuator boundary

every carrier/bus/actuator connector physically absent and photographed

NOT EXECUTED
LP-G08

Pre-connection source check

CH1 OFF while mating; then approved open-circuit voltage/OCP behavior measured before controller connection

NOT EXECUTED
LP-G09

Controlled connection authority

named electrical reviewer signs this exact supply/cable/controller configuration

NOT EXECUTED

Open holds