PRELIMINARY - CURRENT/TORQUE ARCHITECTURE CANDIDATE ONLY - NOT APPROVED FOR CONNECTION, POWERED TESTING, MOTION, OR ENERGIZATION

Current is now allocated before motion.

All 25 joints have candidate register values, current-limited endpoint arithmetic and bus totals. The knee transmission was changed where the electrical boundary and the static load screen disagreed.

Four actuator-family ceilings

XH540

2.499 A

Current Limit raw 929; candidate only.

XM540

2.499 A

Current Limit raw 929; candidate only.

XM430

1.999 A

Current Limit raw 743; candidate only.

XC330

0.700 A

Current Limit raw 700; candidate only.

What the screen says

19

nonzero static development screens pass the current-limited published-stall endpoint arithmetic.

2.5:1

bilateral knee ratio; previous 2:1 candidate rejected for this current boundary.

0

continuous-torque, thermal, protection or motion approvals.

Eight physical bus segments

BusAxesSum of capsBoundary
RS-LARM35.996010 AARITHMETIC SUM OF INTERNAL CAPS ONLY; NOT PDU, WIRE, CONNECTOR OR SUPPLY RATING
RS-LLEG613.993380 AARITHMETIC SUM OF INTERNAL CAPS ONLY; NOT PDU, WIRE, CONNECTOR OR SUPPLY RATING
RS-RARM35.996010 AARITHMETIC SUM OF INTERNAL CAPS ONLY; NOT PDU, WIRE, CONNECTOR OR SUPPLY RATING
RS-RLEG613.993380 AARITHMETIC SUM OF INTERNAL CAPS ONLY; NOT PDU, WIRE, CONNECTOR OR SUPPLY RATING
RS-WAIST12.499010 AARITHMETIC SUM OF INTERNAL CAPS ONLY; NOT PDU, WIRE, CONNECTOR OR SUPPLY RATING
TTL-HEAD21.400000 AARITHMETIC SUM OF INTERNAL CAPS ONLY; NOT PDU, WIRE, CONNECTOR OR SUPPLY RATING
TTL-LDIST21.400000 AARITHMETIC SUM OF INTERNAL CAPS ONLY; NOT PDU, WIRE, CONNECTOR OR SUPPLY RATING
TTL-RDIST21.400000 AARITHMETIC SUM OF INTERNAL CAPS ONLY; NOT PDU, WIRE, CONNECTOR OR SUPPLY RATING

Deterministic local-control rule

Torque remains disabled while identity, operating mode, Current Limit, Goal Current, watchdog, temperature and voltage bounds are written and read back. A safety permit transition never creates a motion command; a fresh bounded trajectory command is separately required.

Control sequence · Control-table map · Axis calculations · Bus budget · Open evidence